1501:21-5-06. The specifications  


Latest version.
  • The specifications shall include the following:

    (A) The general provisions, which shall specify the rights, duties, and responsibilities of the owner, applicant, applicant's engineer, and builder, and the prescribed order of the work.

    (B) The technical provisions, which shall describe approved work methods, testing methods, testing frequency, equipment, materials, and required end results. The structural and hydraulic properties for the materials to be used as well as specifications for preparation and placement of these materials may also be required. The extent and method of quality control shall be subject to approval by the chief.

    (C) Special provisions as may be required, which shall describe those technical details that are not usually contained in standard technical provisions.


Five Year Review (FYR) Dates: 3/7/2018 and 03/06/2023
Promulgated Under: 119.03
Statutory Authority: 1521.06
Rule Amplifies: 1521.06 , 1521.061
Prior Effective Dates: 04/15/1972, 10/15/1981, 12/09/1999, 01/16/2005

Prior History: (R.C. 119.032 review dates: 03/08/2010 and 03/05/2015
Promulgated Under: 119.03
Statutory Authority: 1521.06
Rule Amplifies: 1521.06, 1521.061
Prior Effective Dates: 4-15-72; 10-15-81; 12-9-99; 1-16-05 )