3701:1-52-05. Start of construction  


Latest version.
  • The applicant may not begin construction of a new irradiator prior to the submission to the director of both an application for a license for the irradiator and the fee required by rule 3701:1-38-02 of the Administrative Code. As used in this chapter, the term "construction" includes the construction of any portion of the permanent irradiator structure on the site but does not include: engineering and design work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction of warehouse or auxiliary structures, and other similar tasks. Any activities undertaken prior to the issuance of a license are entirely at the risk of the applicant and have no bearing on the issuance of a license by the director.


Five Year Review (FYR) Dates: 10/25/2016 and 10/15/2021
Promulgated Under: 119.03
Statutory Authority: 3748.04
Rule Amplifies: 3748.04
Prior Effective Dates: 10/20/2002, 9/1/12

Prior History: (Effective: 09/01/2012
R.C. 119.032 review dates: 05/25/2012 and 05/15/2017
Promulgated Under: 119.03
Statutory Authority: 3748.04
Rule Amplifies: 3748.04
Prior Effective Dates: 10/20/2002 )