3745-50-04. Manifest copy submittal requirements for certain interstate waste shipments  


Latest version.
  • In any case in which the state in which waste is generated, or the state in which waste will be transported to a designated facility, requires that the waste be regulated as a hazardous waste or otherwise be tracked through a hazardous waste manifest, the designated facility that receives the waste shall do all of the following, regardless of the state in which the facility is located:

    (A) Complete the facility portion of the applicable manifest.

    (B) Sign and date the facility certification.

    (C) Submit to the e-manifest system a final copy of the manifest for data processing purposes.

    (D) Pay the appropriate per manifest fee to U.S. EPA for each manifest submitted to the e-manifest system, subject to the fee determination methodology, payment methods, dispute procedures, sanctions, and other fee requirements specified in 40 C.F.R. Part 264 subpart FF.

    [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules, and federal statutory provisions referenced in this rule, see rule 3745-50-11 of the Administrative Code titled "Incorporated by reference."]


Effective: 10/5/2020
Five Year Review (FYR) Dates: Exempt
Promulgated Under: 119.03
Statutory Authority: 3734.12
Rule Amplifies: 3734.12