901:3-3-13. Equipment and procedures for flame sterilizers  


Latest version.
  • (A) The container conveyor speed shall be specified in the scheduled process. The container conveyor speed shall be measured and recorded at the start of operations and at intervals of sufficient frequency to ensure that the conveyor speed is as specified in the scheduled process.

    (B) A means of preventing changes in flame intensity and unauthorized speed changes on the conveyor shall be provided.

    (C) The surface temperature of at least one container from each conveyor channel shall be measured and recorded at the entry and at the end of the holding period at intervals of sufficient frequency to ensure that the temperatures specified in the scheduled process are maintained.

    (D) Critical factors specified in the scheduled process shall be measured and recorded on the processing record at intervals of sufficient frequency to ensure that the factors are within the limits specified in the scheduled process.


Effective: 7/4/2015
Five Year Review (FYR) Dates: 04/02/2015 and 07/04/2020
Promulgated Under: 119.03
Statutory Authority: 913.04
Rule Amplifies: 913.03, 913.04
Prior Effective Dates: 12/23/1966, 4/28/2003