3318-3-03 Requirements.  

  • Text Box: ACTION: Final Text Box: DATE: 12/31/2015 10:26 AM

     

     

     

    3318-3-03                    Requirements.

     

     

     

    (A)   All new construction, renovation, repairs, and replacements of state funded facilities shall employ cost-effective, energy-efficient, green building practices to the maximum extent possible.

     

    (B)  Each state agency shall:

     

    (1)   Design and construct state funded facilities achieving the following minimum standards:

     

    (a)   New construction shall be designed so that the fossil-fuel, greenhouse gas emitting, energy consumption of the facility is reduced, as compared to the regional average for that building type as defined in CBECS, by the percentage specified as follows:

     

    (i)   Fifty per cent for designs completed on and after February 16, 2010;

     

    (ii)    Sixty-five per cent for designs completed on and after January 1, 2015;

     

    (iii)   Eighty per cent for designs completed on and after January 1, 2020;

     

    (iv)   Ninety per cent for designs completed on and after January 1, 2025; and

     

    (v)   One-hundred per cent for designs completed on and after January 1, 2030.

     

    (b)    Renovation projects shall be designed so that the fossil-fuel, greenhouse gas emitting, energy consumption of the facility is reduced, as compared to the regional average for that building type as defined in CBECS, by fifty per cent.

     

    (c)    A state agency may apply for a waiver of compliance from the Ohio

    facilities   construction   commission services for the following reasons:

    department   of   administrative

    (i) The facility is less than five thousand square feet in area;

    (ii)(i) The facility does not consume energy for heating, ventilating, or air conditioning; or

    (iii)(ii) The facility is not designed for human occupancy.;or

    (iii) The consumption percentage is not economically achievable in the facility, but the facility can meet a proposed lesser percentage that is achievable.

    (2)    Prior to constructing or renovating any facility five thousand square feet or greater, submit to the office of energy services Ohio facilities construction commission a design that incorporates a life cycle cost analysis that shall determine the reasonably expected costs of facility ownership, operation, maintenance, and disposal including labor and materials for the economic life of the state funded facility. Life cycle costs shall be expressed as an annual cost for each year of the facility's use and capitalization of the initial construction costs.

    (3)    Prior to leasing any facility twenty thousand square feet or greater within a given boundary, submit to the office of energy services Ohio facilities construction commission an energy consumption analysis of the facilty'sfacility's heating, refrigeration, cooling, lighting, hot water, and other major energy-consuming systems, components, and equipment for the term of the proposed lease.

    Effective:                                                             01/10/2016

    Five Year Review (FYR) Dates:                         10/26/2015 and 01/10/2021

    CERTIFIED ELECTRONICALLY

    Certification

    12/31/2015

    Date

    Promulgated Under:                           119.03

    Statutory Authority:                           123.21, 123.22(D)

    Rule Amplifies:                                  123.22

    Prior Effective Dates:                         12/30/1980, 02/16/2010, 4/2/2012

Document Information

Effective Date:
1/10/2016
File Date:
2015-12-31
Last Day in Effect:
2016-01-10
Five Year Review:
Yes
Rule File:
3318-3-03_PH_FF_A_RU_20151231_1026.pdf
Related Chapter/Rule NO.: (1)
Ill. Adm. Code 3318-3-03. Requirements