TO BE RESCINDED
3745-81-52 Consideration of an exemption request.
(A) The director shall act on any exemption request submitted pursuant to rule 3745-81-51 of the Administrative Code within ninety days of receipt of the request.
(B) In his consideration of whether the public water system is unable to comply due to compelling factors, the director shall consider such factors as the following:
(1) Construction, installation, or modification of treatment equipment or systems.
(2) The time needed to put into operation a new treatment facility to replace an existing system which is not in compliance.
(3) Economic feasibility of compliance.
3745-81-52 TO BE RESCINDED 2
Effective: 11/01/2004
R.C. 119.032 review dates: Exempt
CERTIFIED ELECTRONICALLY
Certification
10/08/2004
Date
Promulgated Under: 119.03
Statutory Authority: RC Section 6109.04 (Section
3, Am. Sub. S.B. 445, 112th
General Assembly) Rule Amplifies: RC Section 6109.04 Prior Effective Dates: 12/27/78
Document Information
- Effective Date:
- 11/1/2004
- File Date:
- 2004-10-08
- Last Day in Effect:
- 2004-11-01
- Rule File:
- 3745-81-52_PH_FF_R_RU_20041008_1305.pdf
- Related Chapter/Rule NO.: (1)
- Ill. Adm. Code 3745-81-52. Consideration of an exemption request.