1501:41-12-12 Dock construction permit required.
No person shall construct or maintain a dock, moorage, tie-up, or other
superaqueousstructure for the purpose of mooring vessels on, over, or adjacent to the lands or waters of theDivisiondivision without first having applied for and received a written permitthereforfrom theChiefchief of theDivisiondivision or the chief's authorized agent.(A) Persons desiring to construct and maintain a dock, moorage, tie-up, or other
superaqueousstructure for the purpose of mooring vessels on, over, or adjacent to the lands or waters of theDivisiondivision must submit a written requestthereforto theChiefchief of theDivisiondivision, indicating the exact location, size, and type of the proposed dock, moorage, tie-up, or other mooring structure.(B) The chief may issue a construction permit to the applicant if the following conditions
are met:
If the Chief determines that the proposed dock, tie-up space or othersuperaqueous structure is in accordance with the standard plans and specificationsof the Division for docks, that the proposed dock, tie-up space, or othersuperaqueous structure location is within an area having adequate drinking waterand sanitary facilities as provided for by Section 1541.21 of the Revised Code andother health rules or laws to sustain this and subsequent public use resulting fromadditional construction of docks in the proposed location, and that the proposedstructure will not interfere with navigation or facility management or developmenton state owned or controlled lands or waters, he may issue a construction permit tothe applicant.(1)The design of the proposed dock, moorage, tie-up space, or other mooring structure is in compliance with the standard plans and specifications of the division for vessel moorages, and;
(2)The proposed location of the desired dock, tie-up space, or other structure for the mooring of vessels will not interfere with navigation or facility management or development of the lands and waters under the management authority of the division.
1501:41-12-12 2
Effective: 03/26/2016
Five Year Review (FYR) Dates: 01/08/2016 and 03/26/2021
CERTIFIED ELECTRONICALLY
Certification
03/16/2016
Date
Promulgated Under: 119.03
Statutory Authority: 1541.01
Rule Amplifies: 1541.01, 1541.03, 1541.09
Prior Effective Dates: 7/1/76
Document Information
- Effective Date:
- 3/26/2016
- File Date:
- 2016-03-16
- Last Day in Effect:
- 2016-03-26
- Five Year Review:
- Yes
- Rule File:
- 1501$41-12-12_PH_FF_A_RU_20160316_1605.pdf
- Related Chapter/Rule NO.: (1)
- Ill. Adm. Code 1501:41-12-12. Dock construction permit required