4906-11-02 Construction notice requirements.
(A) A construction notice shall contain the following information:
(1) The name of the project.
(2) A brief description of the project, including a map depicting the facility's location
, a review of the applicant's opinion on the need for the proposedproject,and the reason why the project meets the requirements for a construction notice.(3)If the proposed construction notice project is an electric power transmission line or gas or natural gas transmission line, a statement explaining the need for the proposed facility.
(3)(4) The anticipated construction schedule and proposed in-service date of the project.(4)(5) The estimated capital costs of the project.(5)(6) A description of the operating characteristics, estimated number and types of structures required, and right-of-way requirements.(6)(7) An area map of not less than 1:24,000 scale clearly depicting the facility's location, with clearly marked streets, roads, and highways, and clearly written instructions for locating and viewing the facility.(B) Documentation that the chief executive officer of each municipal corporation and county, and the head of each public agency charged with protecting the environment or of planning land use in the area in which any portion of the facility is to be located have been notified of the project and have been provided a copy of the construction notice.
4906-11-02 2
Effective: 06/17/2005
R.C. 119.032 review dates: 09/30/2008
CERTIFIED ELECTRONICALLY
Certification
06/07/2005
Date
Promulgated Under: 111.15
Statutory Authority: 4906.03
Rule Amplifies: 4906.06, 4906.03
Prior Effective Dates: 10/10/78, 3/20/87, 8/28/98, 12/15/03
Document Information
- Effective Date:
- 6/17/2005
- File Date:
- 2005-06-07
- Last Day in Effect:
- 2005-06-17
- Rule File:
- 4906-11-02_FF_A_RU_20050607_1000.pdf
- Related Chapter/Rule NO.: (1)
- Ill. Adm. Code 4906-11-02. Construction notice requirements