1. New
Huron river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Portage river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Mahoning river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Phase II property assessments.
Generic numerical standards.
Property-specific risk assessment procedures.
Ground water classification and potable use response requirements, and urban setting designations.
Definitions.
Scope and exemptions.
Monitoring well.
Well siting.
Well construction.
Well construction, specific geologic conditions.
Well grouting for construction or closure.
Well disinfection.
Well development and pumping test.
Abandoned well sealing.
Provider access to the HPP - non-certified provider enrollment.
Effective: 3/29/2002
Hearing: 3/29/2002
Provider access to the HPP - provider recredentialing and recertification.
Effective: 3/29/2002
Hearing: 3/29/2002
Independent housing licensing standards.
2. Amendment
Scioto river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Grand river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Central Ohio tributaries drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Southwest Ohio tributaries drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Rocky river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Cuyahoga river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Control of emissions of organic materials from stationary sources (i.e., emissions that are not regulated by rule 3745-21-09, 3745-21-12, 3745-21-13, 3745-21-14, 3745-21-15, 3745-21-16, or 3745-21-18 of the Administrative Code).
Eligibility for participation in the voluntary action program.
Payment of prize awards.
Definitions.
Effective: 3/29/2002
Hearing: 3/29/2002
Provider access to the HPP - generally.
Effective: 3/29/2002
Hearing: 3/29/2002
Provider access to the HPP - provider credentialing criteria.
Effective: 3/29/2002
Hearing: 3/29/2002
Provider access to the HPP - provider application and credentialing.
Effective: 3/29/2002
Hearing: 3/29/2002
Provider access to the HPP - provider not certified.
Effective: 3/29/2002
Hearing: 3/29/2002
Halfway house licensing standards.
Modifications.
Effective: 4/1/2002
Hearing: 4/1/2002
3. Rescission
Huron river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Portage river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Mahoning river drainage basin.
Effective: 7/21/2002
Hearing: 7/21/2002
Permit to install.
Phase II property assessments.
Generic numerical standards.
Property-specific risk assessment procedures.
Ground water classification and potable use response requirements, and urban setting designations.
Definitions.
Scope and exemptions.
Monitoring well.
Well siting.
Well construction.
Well construction, specific geologic conditions.
Well grouting for construction or closure.
Well disinfection.
Well development and pumping test.
Abandoned well sealing.
Provider access to the HPP - provider recredentialing and recertification.
Effective: 3/29/2002
Hearing: 3/29/2002
Independent housing licensing standards.
4. No Change
Requirements for plan drawings.
Glossary of terms.