3745-54-54. Amendment of contingency plan  


Latest version.
  • (A) The contingency plan shall be reviewed, and immediately amended if necessary, whenever any of the following:

    (1) The facility's Ohio hazardous waste permit is modified.

    (2) The contingency plan fails in an emergency.

    (3) The facility changes - in its design, construction, operation, maintenance, or other circumstances - in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency.

    (4) The list of emergency coordinators changes.

    (5) The list of emergency equipment changes.

    (6) Required by the director.

    (B) A change in the list of facility emergency coordinators or equipment in the contingency plan constitutes a minor modification to the facility's Ohio hazardous waste permit to which the contingency plan is a condition.


Effective: 10/31/2015
Five Year Review (FYR) Dates: 07/01/2015 and 07/01/2020
Promulgated Under: 119.03
Statutory Authority: 3734.12
Rule Amplifies: 3734.12
Prior Effective Dates: 04/15/1981, 01/07/1983